myTNB
  • en
  • BM
Residential
Get Electricity
Understanding Your Electricity Bill
Disconnection & Reconnection
Special Scheme
Power Alert
Business
Get Electricity
Understanding Your Electricity Bill
Commercial
Industrial
Mining
Street Lighting
Specific Agriculture
Top Up and Standby (CO-GENERATOR)
Special Schemes
Power Alert
Energy Efficiency
Home Energy Savings Tips
Commercial Energy Savings Tips
Industrial Energy Savings Tips
Energy Savings At Work
Power Quality
Power Factor
Renewable Energy
Benefits Of Generating Your Own RE
Find The Right RE Solution For You
Find Out More About Our Green Products
Guidelines For Service Provider Electrical Contractor Consultant
NEM Application
NEM Net Energy Metering
SELCO Self Consumption
FIT Feed-in Tariff
LSS Large Scale Solar
NEDA New Enhanced Dispatch Arrangement
Renewable Energy Certificate
Solar Energy Purchase
Payment
myTNB, e-Wallet, JomPAY, Online & Phone Banking
Kedai Tenaga
AutoPay & Direct Debit
eBulk
Over the Counter
ATM & CDM
EFT & Cheque Payment
Safety and Advisory
Do's and Dont's
RCCB
Electrical & Magnetic Fields
Electrical Safety Guidelines During Flooding
Electricity Theft
Promotions
Home > Business > Get Electricity > Upgrade / Downgrade Electricity >

GET ELECTRICITY

Get all the information you need to provide electricity for your business.

Upgrade Upgrade / Downgrade Electricity
Start & Stop Electricity Tenancy Tenancy Change Of Tenancy Upgrade Upgrade Upgrade / Downgrade Electricity Change of Tariff Connection Charge Security Deposit TNB Electricity System

UPGRADE / DOWNGRADE

Learn more about electricity supply and when to upgrade.

Household electricity supply

Single-phase meter

Measures usage from a 230 Volt supply through two (2) wires

3-phase meter

Measures usage from a 400 Volt supply through four (4) wires

WHEN TO CHANGE

You are advised to change from a single-phase supply to a 3-phase supply when your household electricity load exceeds 10kW or 50A. As a rule of thumb, if you have three (3) or more air conditioners in your home, you should upgrade to a 3-phase supply as it will increase stability and reliability of electricity supply.

  • Connection charges

    Changing from a single-phase supply to a 3-phase supply would require connection charges.

    Example 1: Encik Ahmad’s current single story terrace house is given a single phase electricity supply via an overhead cable. He is applying for change of load since he has already installed four air conditioners:

    Connection charge

    =Standard connection charge for NEW three phase overhead supply

    MINUS

    Connection charge paid for EXISTING single phase overhead supply

    =RM750 - RM450

    =RM300

    Connection
     
    charge
    =
    Standard connection charge for NEW three phase overhead supply
    MINUS Connection charge paid for EXISTING single phase overhead supply
     
    = RM750 - RM450
     
     
    = RM300
     

    Example 2: Mr Tan’s current bungalow is given a single phase electricity supply via an overhead cable. Since he has installed many electrical equipment including five air conditioners, he is applying for load change to a three phase supply via an underground cable.

    Connection charge

    =Standard connection charge for NEW three phase overhead supply

    MINUS

    Connection charge paid for EXISTING single phase overhead supply

    =RM1,700 - RM450

    =RM1,250*

    Connection
     
    charge
    =
    Standard connection charge for NEW three phase underground supply
    MINUS Connection charge paid for EXISTING single phase overhead supply
     
    = RM1,700 - RM450
     
     
    = RM1,250*
     

    *Amount excludes any additional charges that may apply should any extra work required such as requirements by the local council to use Horizontal Directional Drilling (HDD) or Mil and Pave road works.

    *For all load changes applications, additional Security Deposit would be required due to expected increase in bill amount. Please enquire at any Kedai Tenaga TNB to know more about the charges involved for the change of load.

    *Note

    Charges may also apply for downgrade cases. Should you need any additional information on this, kindly contact us at 1300-88-5454 or e-mail us at tnbcareline@tnb.com.my

What is the application process for Upgrade/Downgrade Supply Application through online?

icon-call

Online Application

  • Visit www.mytnb.com.my for online application

Appoint Contractor

  • Appoint Electrical Contractor from the Energy Commission Electrical Contractor list.
  • The appointed Electrical Contractor shall submit the electricity application form (Malay or English) together with the required documents to TNB
icon-form

Fill Up Form

  • Customer fills the electricity online application form, signs the digital electricity supply contract (electricity application form) with TNB
icon-form

Pay Essential Charges

  • TNB comes up with the connection charges relevant with the electricity connection
  • Customer pays the connection charges and RM10 stamp duty online or at Kedai Tenaga
icon-form

Get Electricity Supply

  • Customer pays the electricity deposit
  • TNB installs meter and connects supply

Note: Currently under this category, customers are required to pay upfront all these essential charges which include the Connection Charges, Stamp Duty and Security Deposit to apply for electricity. To get the best deal among the listed contractors, customers are advised to liaise and request for quotations prior to appointing one.

Required document
Required documents by applicant Under personal name Company / Sole Proprietorship / Enterprise / Partnership / Society Government body / Agencies Document details
Completed & Signed Application Form

✓

✓

✓

 
Copy of Applicant’s Identification Document

✓

IC Copy of Authorized Person / Representative IC Copy of Authorized Person / Representative (Optional) e.g. NRIC or Passport

-

Letter of Authorization with Company Letterhead Letter of Authorization with Government / Agency Letterhead e.g. Letter indicating the company representative’s name and NRIC
Copy of Registration Certificate

-

✓

-

e.g. Company (Form 9) or Business (Form D) or Joint Management Body Certificate or Management Corporate Certification or Association Registration Certificate or any other form of official registration document of the organization (for examples, Mosques and Private Islamic School are registered under The State Islamic Department, or Cooperatives are registered Cooperative Commission of Malaysia).
REQUIRED DOCUMENTS BY THE APPOINTED ELECTRICAL CONTRACTOR

Form G - Supervision and completion certificate

Form H - Test Certificate

✓

Metering Schematic (for Maximum Demand >100A)

✓

How to apply

 

Just login to www.mytnb.com.my to submit your request online. You would will be required select the preferred contractor and to clear outstanding payment (if any) online. This service is applicable to:

 
  • Individual (Residential Category) Customers
  • TNB Registered Electrical Contractors
 

Note: Online application is only applicable for maximum demand of 60kW (or 100A) only. For Large Power Consumers (LPC), application must be made through Kedai Tenaga.

Where to apply?

At Kedai Tenaga nearest to your premise

Submit your application to load change via a qualified electrical contractor registered with the Energy Commission.

myTNB
  • Residential
  • Business
  • Energy Efficiency
  • Renewable Energy
  • Payment
  • Safety and Advisory
  • Promotions
For General Enquiries, Please Contact TNB CareLine via Facebook  @TNBCareline or Call 1-300-88-5454
  • Weekdays: 8.00 AM - 7.00 PM
  • Weekend & Public holiday: 8.00 AM - 5.00 PM
  • Email us at   tnbcareline@tnb.com.my
    Follow Us On
    Download myTNB App
    Browser Compatibility
    myTNB
    myTNB
    • Terms & Conditions
    • Privacy Policy
    • Guides & Booklets

    Copyright © 2025 Tenaga Nasional Berhad. All Rights Reserved.

    Browser Compatibility Requirement
    Supported browsers would be limited to the following (compliant with HTML5 and above and CSS3 standards) with best view resolution of 1920 x 1080:
    Internet Explorer
    Internet Explorer
    (10.x and above)
    Mozilla Firefox
    Mozilla Firefox
    (38.x and above)
    Google Chrome
    Google Chrome
    (42.x and above)
    Safari
    Safari
    (8.x and above)