Get all the information you need to generate your own clean energy.
Apart from Net Metering, SELCO is another option for you to generate electricity from your own solar PV system, to offset or reduce your electricity bills. SELCO lets you consume all the electricity generated by your solar system but will not allow any excess to flow into the utility network.
You are required to present to TNB the power flow study of the proposed connection of your generating plant/source (if the installed capacity of the solar PV system is 425kW and above) so we can identify whatever effects it may have on the utility network.
For information regarding licensing requirement, please refer to www.st.gov.my.
The customer is required to register the solar PV system installation with TNB by submitting the following documents:
Find your registered contractor/ service provider (RC/SP)
If your generated capacity is equal or more than 425kW, a technical assessment is needed
Present technical assessment to TNB
Your (RC/SP) will install solar PV System
Register your installation with TNB and apply for generation license from Suruhanjaya Tenaga (ST) if required.
If you have a specific question regarding SELCO, please contact us at [email protected].
Refer to SELCO guideline here.