myTNB
  • en
  • BM
Residential
Get Electricity
Understanding Your Electricity Bill
Disconnection & Reconnection
Special Scheme
Power Alert
Business
Get Electricity
Understanding Your Electricity Bill
Commercial
Industrial
Mining
Street Lighting
Specific Agriculture
Top Up and Standby (CO-GENERATOR)
Special Schemes
Power Alert
Energy Efficiency
Home Energy Savings Tips
Commercial Energy Savings Tips
Industrial Energy Savings Tips
Energy Savings At Work
Power Quality
Power Factor
Renewable Energy
Benefits Of Generating Your Own RE
Find The Right RE Solution For You
Find Out More About Our Green Products
Guidelines For Service Provider Electrical Contractor Consultant
NEM Application
NEM Net Energy Metering
SELCO Self Consumption
FIT Feed-in Tariff
LSS Large Scale Solar
NEDA New Enhanced Dispatch Arrangement
Renewable Energy Certificate
Solar Energy Purchase
Payment
myTNB, e-Wallet, JomPAY, Online & Phone Banking
Kedai Tenaga
AutoPay & Direct Debit
eBulk
Over the Counter
ATM & CDM
EFT & Cheque Payment
Safety and Advisory
Do's and Dont's
RCCB
Electrical & Magnetic Fields
Electrical Safety Guidelines During Flooding
Electricity Theft
Promotions
Home > Business > Get Electricity > TNB Electricity System >

GET ELECTRICITY

Get all the information you need to provide electricity for your business.

TNB Electricity System
Start & Stop Electricity Tenancy Tenancy Change Of Tenancy Upgrade Upgrade Upgrade / Downgrade Electricity Change of Tariff Connection Charge Security Deposit TNB Electricity System

TNB ELECTRICITY SYSTEM

Learn more about TNB electricity system.

Voltages

TRANSMISSION

500kV, 275kV & 132kV

DISTRIBUTION

33kV, 11kV & 400/230 volts
22kV & 6.6kV (certain parts of Johor)

SUPPLY FREQUENCY

50Hz ± 1%

Earthing System

High Voltage & Extra High voltage Medium Voltage Low voltage 400/230V
3 phase configuration 3 phase configuration 3 phase 4 wire system
Solidly earthed Impedance-earthed (NER) Solidly earthed
Overhead lines and underground cable are used extensively for high and extra high voltage distribution Overhead lines and underground cable are used extensively for medium voltage distribution Overhead lines and underground cable are used extensively for low voltage distribution

SHORT CIRCUIT RATINGS

Here are the maximum fault levels for various voltage systems:

System Short circuit rating
500kV 50kA, 1s
275kV 40kA, 3s (50kA, 1s for substation adjacent to Power Station, or within 500kV substation)
132kV 31.5kA, 3s (40kA, 3s for substation adjacent to Power Station, or within 500kV/275kV substation)
33kV 25kA, 3s
22kV 20kA, 3s
11kV 20kA, 3s
6.6kV 20kA, 3s
400/230V 31.5kA, 3s

Act, Regulation and Code

The electricity supply and installation practices in Peninsular Malaysia are governed by:

Electricity Supply Act 1990 - Act 447

Licensee Supply Regulations 1990

Electricity Regulations, 1994

Occupational, Safety & Health Act 1994

Malaysian Standard MS IEC 60364 Electrical Installation of Buildings

Electricity Supply (Amendment) Act 2015 [Act A1501]

Electricity (Amendment) Regulations 2013 P.U.(A)151

Electricity (Amendment) Regulations 2014 P.U.(A)73

Electricity (Amendment) (No.2) Regulations 2014 P.U.(A)136

SUPPLY VOLTAGE OPTIONS

Supplies to domestic premises are given at single phase 2-wire or three phase 4-wire. However, the actual supply voltage provided depends on the magnitude of your load requirements.

Low voltage Medium voltage & high voltage
Low voltage
Medium voltage & high voltage
Single-phase, two-wire, 230V, up to 12kVA maximum demand
Three-phase, four-wire, 400V, up to 72kVA (100A) maximum demand
Three-phase, four-wire, C.T. metered, 400/230V, up to 1000kVA maximum demand
Three-phase, three-wire, C.T. metered
Three-phase, three-wire, 11kV for load of maximum demand 1,000 kVA to 5,000kVA
Three-phase, three-wire, 22kV for load of maximum demand 1,000kVA to 10,000kVA
Three-phase, three-wire, 33kV for load of maximum demand 5,000kVA to 25,000kVA
Three-phase, three-wire, 132kV and 275kV for exceptional high load maximum demand above 25,000kVA

Voltages other than the above classifications cannot be provided by TNB. However, you may opt to make your own transformation arrangements where necessary.

ADDENDUM ON ELECTRICITY SUPPLY APPLICATION HANDBOOK (ESAH)


To download the Electricity Supply Application Handbook (ESAH), Click Here.

Also Available:

  • Substation Design Booklet
  • CSU Plinth Design
  • PIAT Civil Checklist for 11kV Substation
  • Anti Climb Fence 2019
myTNB
  • Residential
  • Business
  • Energy Efficiency
  • Renewable Energy
  • Payment
  • Safety and Advisory
  • Promotions
For General Enquiries, Please Contact TNB CareLine via Facebook  @TNBCareline or Call 1-300-88-5454
  • Weekdays: 8.00 AM - 7.00 PM
  • Weekend & Public holiday: 8.00 AM - 5.00 PM
  • Email us at   tnbcareline@tnb.com.my
    Follow Us On
    Download myTNB App
    Browser Compatibility
    myTNB
    myTNB
    • Terms & Conditions
    • Privacy Policy
    • Guides & Booklets

    Copyright © 2025 Tenaga Nasional Berhad. All Rights Reserved.

    Browser Compatibility Requirement
    Supported browsers would be limited to the following (compliant with HTML5 and above and CSS3 standards) with best view resolution of 1920 x 1080:
    Internet Explorer
    Internet Explorer
    (10.x and above)
    Mozilla Firefox
    Mozilla Firefox
    (38.x and above)
    Google Chrome
    Google Chrome
    (42.x and above)
    Safari
    Safari
    (8.x and above)