mytnb
  • en
  • BM
Residential
Get Electricity
Understanding Your Electricity Bill
Disconnection & Reconnection
Special Scheme
Power Alert
Bisnes
Dapatkan Bekalan Elektrik
Memahami Bil Elektrik Anda
Komersial
Perindustrian
Perlombongan
Lampu Jalan
Pertanian Spesifik
Top Up and Standby (CO-GENERATOR)
Skim Istimewa
Power Alert
Energy Efficiency
Home Energy Savings Tips
Commercial Energy Savings Tips
Industrial Energy Savings Tips
Energy Savings At Work
Power Quality
Power Factor
Renewable Energy
Benefits Of Generating Your Own RE
Find The Right RE Solution For You
Find Out More About Our Green Products
Guidelines For Service Provider Electrical Contractor Consultant
NEM Application
NEM Net Energy Metering
SELCO Self Consumption
FIT Feed-in Tariff
LSS Large Scale Solar
NEDA New Enhanced Dispatch Arrangement
Renewable Energy Certificate
Solar Energy Purchase
Payment
myTNB, e-Wallet, JomPAY, Online & Phone Banking
Kedai Tenaga
AutoPay & Direct Debit
eBulk
Over the Counter
ATM & CDM
EFT & Cheque Payment
Safety and Advisory
Do's and Dont's
RCCB
Electrical & Magnetic Fields
Electrical Safety Guidelines During Flooding
Electricity Theft
Promotions
Utama > Renewable Energy > Guidelines For Service Provider Electrical Contractor Consultant >

RENEWABLE ENERGY

Get all the information you need to generate your own clean energy.

Guidelines For Service Provider Electrical Contractor Consultant
Benefits Of Generating Your Own RE Find The Right RE Solution For You Find Out More About Our Green Products Guidelines For Service Provider Electrical Contractor Consultant NEM Application NEM Net Energy Metering SELCO Self Consumption FIT Feed-in Tariff LSS Large Scale Solar NEDA New Enhanced Dispatch Arrangement Renewable Energy Certificate Solar Energy Purchase

GUIDELINES FOR SERVICE PROVIDER / ELECTRICAL CONTRACTOR / CONSULTANT

As an installer or electrical contractor or consultant in the RE industry, you play an important role in guiding our customers through the application, installation and connection process.

  • Preliminary

    A distributed generation (DG) system is one that is connected to a distribution network (up to <30MW) rather than connected to the high voltage transmission network. All DG units that are to be connected to our network, whether exporting or non-exporting, must be approved by relevant authority before installation. We ask that you ensure your customers are aware of this requirement.


    STEP 1 Determine your RE scheme

    There are several connection processes, depending on the chosen scheme.

    FiT     NEM     LSS     NEDA     SELCO

    If you are still not sure, find the right scheme for you here.

    STEP 2 Determine technical study requirement, and apply online if applicable.

    Your connection application may require technical study, as explained in the next section. If applicable submit technical study application online on behalf of your customers via MyTNB Portal, a quick and easy way to submit application, pay fee and view completed reports online.


    STEP 3 Get approval from relevant authority

    You need to get approval from relevant authority according to the chosen scheme.


    STEP 4 Sign Power Purchase Agreement/Registration

    Once approval is obtained, we require your customer to enter into a power purchase agreement that governs the ongoing connection of your facility to our distribution system. For self consumption, only registration is required.

    If you intend to connect 30MW or more of generation capacity, please refer to:

    Grid Planning Department,
    Grid Division, TNB,
    Aras 21, Bangunan 2 Sentral,
    8 Jalan Tun Sambanthan,
    50470 Kuala Lumpur.

  • Technical Study Requirement

    Some applications to connect a generating unit to TNB network require a technical assessment. This is because we have an obligation to operate, maintain and protect our network to ensure the reliable and secure connection and supply of electricity to our customers.

    RE Scheme - Net Energy Metering (NEM)

    RE Scheme Technical Study by TNB
    Generation Capacity Fee Duration
    Net Energy Metering (NEM) Net Energy Metering Assessment (NEMAS)
    >72kW - 180kW RM1,000 30 days
    >180kW - 425kW RM5,000
    >425kW - 1MW RM8,000
    >1MW - 2MW RM15,000
    >2MW - 5MW RM20,000
    >5MW - 10MW RM30,000
    >10MW - 30MW RM40,000
    Others Power System Study (PSS)
    ≤1 MW RM20,000 30 days
    >1MW - 10MW RM40,000 40 days
    >10MW - <30MW RM60,000 50 days


    If an application does not need to be assessed, that does not imply our guarantee of effective operation. It remains the installer's responsibility to do their testing and be confident the proposed generating unit will meet customer performance expectations. Similarly, our assessment are provided at a point in time and are not a guarantee a unit will operate effectively.
    For self consumption generating unit of ≥425kW, you need to conduct own PSS to be approved by TNB.

  • Connection Essentials

    Upon successfully signing the power purchase agreement, you are now ready to connect to TNB network. TNB has released Technical Guidelines for Interconnection of Distributed Generator to Distribution System that focuses on providing recommended practice for utility interconnection of DG systems in a manner that will allow the DG system to perform as expected and be installed at a reasonable cost while not compromising safety or operational issues.


    Interconnection Works
    You are responsible at your own cost for carrying out the applicable interconnection facilities up to the connection point, and any necessary modification to TNB existing electricity distribution network required to facilitate network required to facilitate the acceptance of RE generated by the RE installation in accordance to prudent utility practices.
    Metering
    Unlike the conventional unidirectional meter, the RE meter shall have import and export functions. There may be cost incurred to assess and/or replace the existing meter, or to install new meter.
    Testing & Commissioning (T&C)
    Upon successful completion of T&C and documents submission, consumer can start generating their own clean energy, and enjoy the benefits that comes with it.

Get In Touch

If you have any further query please contact us at re@tnb.com.my.

  • Residential
  • Bisnes
  • Energy Efficiency
  • Renewable Energy
  • Payment
  • Safety and Advisory
  • Promotions
Untuk sebarang pertanyaan, sila hubungi TNB CareLine via Facebook  @TNBCareline or Call 1-300-88-5454
  • Isnin-Jumaat: 8.00 pagi - 7.00 malam
  • Sabtu, Ahad & Cuti Umum: 8.00 pagi - 5.00 petang
  • Hantar e-mel ke   tnbcareline@tnb.com.my
    Ikuti kami di
    Muat turun Aplikasi myTNB
    Keserasian Pelayar
    • Terma & Syarat
    • Dasar Privasi
    • Buku Panduan & Risalah

    Copyright © 2023 Tenaga Nasional Berhad. All Rights Reserved.

    Browser Compatibility Requirement
    Supported browsers would be limited to the following (compliant with HTML5 and above and CSS3 standards) with best view resolution of 1920 x 1080:
    Internet Explorer
    Internet Explorer
    (10.x and above)
    Mozilla Firefox
    Mozilla Firefox
    (38.x and above)
    Google Chrome
    Google Chrome
    (42.x and above)
    Safari
    Safari
    (8.x and above)