mytnb
  • en
  • BM
Residential
Get Electricity
Understanding Your Electricity Bill
Disconnection & Reconnection
Special Scheme
Power Alert
Bisnes
Dapatkan Bekalan Elektrik
Memahami Bil Elektrik Anda
Komersial
Perindustrian
Perlombongan
Lampu Jalan
Pertanian Spesifik
Top Up and Standby (CO-GENERATOR)
Skim Istimewa
Power Alert
Energy Efficiency
Home Energy Savings Tips
Commercial Energy Savings Tips
Industrial Energy Savings Tips
Energy Savings At Work
Power Quality
Power Factor
Renewable Energy
Benefits Of Generating Your Own RE
Find The Right RE Solution For You
Find Out More About Our Green Products
Guidelines For Service Provider Electrical Contractor Consultant
NEM Application
NEM Net Energy Metering
SELCO Self Consumption
FIT Feed-in Tariff
LSS Large Scale Solar
NEDA New Enhanced Dispatch Arrangement
Renewable Energy Certificate
Solar Energy Purchase
Payment
myTNB, e-Wallet, JomPAY, Online & Phone Banking
Kedai Tenaga
AutoPay & Direct Debit
eBulk
Over the Counter
ATM & CDM
EFT & Cheque Payment
Safety and Advisory
Do's and Dont's
RCCB
Electrical & Magnetic Fields
Electrical Safety Guidelines During Flooding
Electricity Theft
Promotions
Utama > Renewable Energy > SELCO Self Consumption >

RENEWABLE ENERGY

Get all the information you need to generate your own clean energy.

SELCO Self Consumption
Benefits Of Generating Your Own RE Find The Right RE Solution For You Find Out More About Our Green Products Guidelines For Service Provider Electrical Contractor Consultant NEM Application NEM Net Energy Metering SELCO Self Consumption FIT Feed-in Tariff LSS Large Scale Solar NEDA New Enhanced Dispatch Arrangement Renewable Energy Certificate Solar Energy Purchase

SELF CONSUMPTION (SELCO)

  • About

    Apart from Net Metering, SELCO is another option for you to generate electricity from your own solar PV system and thus reduce your electricity bills. SELCO lets you consume all the electricity generated by your solar system but no excess energy is allowed to flow into the utility network.


    The new SELCO Guideline published on 1st of January 2025 specified new criteria for SELCO application.


    For Grid-Connected System under Non-Domestic Consumer, no capacity limit is set on the solar PV installation while for Domestic Consumer the capacity of the solar PV installation shall not exceed:

    1. 5kW for single-phase 230V supply; or
    2. 12.5kW for three-phase 400V supply.

    For Non-Domestic Consumer with capacity more than 72kWp, it is required to conduct Connection Assessment Study (CAS) and to install Battery Energy Storage System (BESS) for the purpose of reducing the impact of intermittent energy production of the Solar PV System on the Grid System.


    SELCO Consumer shall inform TNB on the installation of the Solar PV System by submitting a copy of the Form of Information of Solar PV Installation prior to the installation of the Solar PV System.


    For Non-Domestic Consumer with capacity above 72kWp, it is required to have a license granted by Energy Commission under the Electricity Supply Act 1990 [Act 447]. Consumer is also required to submit the SELCO Form of Information of Solar PV Installation and related documents to Energy Commission before the commissioning of the solar PV installation.


    For Non-Domestic Consumer with capacity 72kWp and below, consumers are required to submit the following documents to Energy Commission within thirty (30) days after commissioning of the solar PV installation:

    1. Form of Information of Solar PV Installation
    2. A copy of Supervision and Completion Certificate (Form G) and Test Certificate (Form H) of the solar PV installation duly signed by the Competent Person.

    For information regarding licensing requirements, please refer to www.st.gov.my.

  • How to Apply

    STEP 1

    Find your registered contractor/ service provider (RC/SP)

    STEP 2

    Perform and submit CAS report for approval to TNB, if your generated capacity is equal to or more than 72kWp

    STEP 3

    Submit Form of Information to TNB prior to the installation of the Solar PV System

    STEP 4

    Apply for generation license from Energy Commission (with capacity above 72kWp)

    STEP 5

    Your (RC/SP) will install solar PV System

    STEP 6

    Submit Form of Information and relevant documents to Energy Commission within thirty (30) days after commissioning the solar PV installation (with capacity above 72kWp)

Get In Touch

If you have a specific question regarding SELCO, please contact us at re@tnb.com.my.

Refer to SELCO guideline here. 

  • Residential
  • Bisnes
  • Energy Efficiency
  • Renewable Energy
  • Payment
  • Safety and Advisory
  • Promotions
Untuk sebarang pertanyaan, sila hubungi TNB CareLine via Facebook  @TNBCareline or Call 1-300-88-5454
  • Isnin-Jumaat: 8.00 pagi - 7.00 malam
  • Sabtu, Ahad & Cuti Umum: 8.00 pagi - 5.00 petang
  • Hantar e-mel ke   tnbcareline@tnb.com.my
    Ikuti kami di
    Muat turun Aplikasi myTNB
    Keserasian Pelayar
    • Terma & Syarat
    • Dasar Privasi
    • Buku Panduan & Risalah

    Copyright © 2023 Tenaga Nasional Berhad. All Rights Reserved.

    Browser Compatibility Requirement
    Supported browsers would be limited to the following (compliant with HTML5 and above and CSS3 standards) with best view resolution of 1920 x 1080:
    Internet Explorer
    Internet Explorer
    (10.x and above)
    Mozilla Firefox
    Mozilla Firefox
    (38.x and above)
    Google Chrome
    Google Chrome
    (42.x and above)
    Safari
    Safari
    (8.x and above)