myTNB
  • en
  • BM
Residential
Get Electricity
Understanding Your Electricity Bill
Disconnection & Reconnection
Special Scheme
Power Alert
Business
Get Electricity
Understanding Your Electricity Bill
Commercial
Industrial
Mining
Street Lighting
Specific Agriculture
Top Up and Standby (CO-GENERATOR)
Special Schemes
Power Alert
Energy Efficiency
Home Energy Savings Tips
Commercial Energy Savings Tips
Industrial Energy Savings Tips
Energy Savings At Work
Power Quality
Power Factor
Renewable Energy
Benefits Of Generating Your Own RE
Find The Right RE Solution For You
Find Out More About Our Green Products
Guidelines For Service Provider Electrical Contractor Consultant
NEM Application
NEM Net Energy Metering
SELCO Self Consumption
FIT Feed-in Tariff
LSS Large Scale Solar
NEDA New Enhanced Dispatch Arrangement
Renewable Energy Certificate
Solar Energy Purchase
Payment
myTNB, e-Wallet, JomPAY, Online & Phone Banking
Kedai Tenaga
AutoPay & Direct Debit
eBulk
Over the Counter
ATM & CDM
EFT & Cheque Payment
Safety and Advisory
Do's and Dont's
RCCB
Electrical & Magnetic Fields
Electrical Safety Guidelines During Flooding
Electricity Theft
Promotions
Home > Business > Understanding Your Electricity Bill > Pricing & Tariff >

UNDERSTANDING YOUR ELECTRICITY BILL

Pricing & Tariff
Online Bill Layout Billing Component Bill Calculator Pricing & Tariff

PRICING & TARIFF

All about TNB’s tariff rates.
  • Commercial

    Commercial Tariff

    Tariff category Unit Current rate (1 Jan 2014)
    Tariff B – Low voltage commercial tariff
    For the first 200kWh (1-200kWh) per month sen/KWh 43.50
    For the next kWh (201kWh onwards) per month sen/KWh 50.90
    Minimum monthly charge is RM7.20
    Tariff C1 – Medium voltage general commercial tariff
    For each kilowatt of maximum demand per month RM/kW 30.30
    For all kWh sen/KWh 36.50
    Minimum monthly charge is RM600.00
    Tariff C2 – Medium voltage peak/off-peak commercial tariff
    For each kilowatt of maximum demand per month during the peak period RM/kW 45.10
    For all kWh during the peak period sen/KWh 36.50
    For all kWh during the off-peak period sen/KWh 22.40
    Minimum monthly charge is RM600.00
    Rates (1 Jan 2014)
    Rates (1 Jun 2011)
    Rates (1 Mar 2009)
    Tariff book
  • Industrial

    Industrial Tariff

    Tariff category Unit Current rate (1 Jan 2014)
    Tariff D – Low voltage industrial tariff
    For the first 200kWh (1-200kWh) per month sen/KWh 38.00
    For the next kWh (201kWh onwards) per month sen/KWh 44.10
    Minimum monthly charge is RM7.20
    Tariff E1 – Medium voltage general industrial tariff
    For each kilowatt of maximum demand per month RM/kW 29.60
    For all kWh sen/KWh 33.70
    Minimum monthly charge is RM600.00
    Tariff E2 – Medium voltage peak/off-peak industrial tariff
    For each kilowatt of maximum demand per month during the peak period RM/kW 37.00
    For all kWh during the peak period sen/KWh 35.50
    For all kWh during the off-peak period sen/KWh 21.90
    Minimum monthly charge is RM600.00
    Tariff E3 – High voltage peak/off-peak industrial tariff
    For each kilowatt of maximum demand per month during the peak period RM/kW 35.50
    For all kWh during the peak period sen/KWh 33.70
    For all kWh during the off-peak period sen/KWh 20.20
    Minimum monthly charge is RM600.00
    Rates (1 Jan 2014)
    Rates (1 Jun 2011)
    Rates (1 Mar 2009)
    Tariff book
  • Mining

    Mining Tariff

    Tariff category Unit Current rate (1 Jan 2014)
    Tariff F – Low voltage mining tariff
    For all kWh sen/KWh 38.10
    Minimum monthly charge is RM120.00
    Tariff F1 – Medium voltage general mining tariff
    For each kilowatt of maximum demand per month RM/kW 21.10
    For all kWh sen/KWh 31.30
    Minimum monthly charge is RM120.00
    Tariff F2 – Medium voltage peak/off-peak mining tariff
    For each kilowatt of maximum demand per month during the peak period RM/kWh 29.80
    For all kWh during the peak period sen/KWh 31.30
    For all kWh during the off-peak period sen/KWh 17.20
    Minimum monthly charge is RM120.00
  • Street Lighting

    Street Lighting

    Charges and Tariff Rates

    "Street Lighting Consumer" means a consumer lighting up public roads, highways and bridges excluding tolled roads and highways.

    "Neon & Floodlight Consumer" means a consumer lighting up neon and floodlight installations for roadside advertisements, billboards, buildings, traffic lights, signages, bus-stops and telephone kiosks or for decorating the facade of buildings. For this purpose, the consumer must install facilities for separate metering system and pay full installation costs incurred by TNB to provide the supply.

    Tariff category Unit Current rate (1 Jan 2014)
    Tariff G - Street Lighting Tariff
    For all kWh (including maintenance) sen/kWh 30.50
    For all kWh (excluding maintenance) sen/kWh 19.20
    The minimum monthly charge is RM 7.20
    Tariff G1 - Neon & Floodlight Tariff
    For all kWh sen/kWh 20.80
    The minimum monthly charge is RM 7.20
  • Specific Agriculture

    Specific Agriculture Tariffs

    Tariff category Unit Current rate (1 Jan 2014)
    Tariff H – Low voltage specific agriculture tariff
    For the first 200kWh (1-200kWh) per month sen/KWh 39.00
    For the next kWh (201kWh onwards) per month sen/KWh 47.20
    Minimum monthly charge is RM7.20
    Tariff H1 – Medium voltage general specific agriculture tariff
    For each kilowatt of maximum demand per month RM/kW 30.30
    For all kWh sen/KWh 35.10
    Minimum monthly charge is RM600.00
    Tariff H2 – Medium voltage peak/off-peak specific agriculture tariff
    For each kilowatt of maximum demand per month during the peak period RM/kW 40.80
    For all kWh during the peak period sen/KWh 36.50
    For all kWh during the off-peak period sen/KWh 22.40
    Minimum monthly charge is RM600.00
  • Top-up & standby services (only for co-generators)

    Top-up and standby services (only for co-generators)

    Co-generators are generators that use a single primary energy source to sequentially generate two different forms of useful energy for its own use at an efficiency rate of more than 70%.

    Services offered:

    Top-up supply

    Additional supply required by a co-generator that does not produce sufficient electricity for its own use.

    Standby supply

    Supply that TNB provides to a co-generator whenever a co-generator does not generate electricity due to plant failure or planned shutdown for maintenance.

    Tariff category Unit
    Current rate (1 Jan 2014)
    Top-up Standby
    Tariff C1 – Medium voltage general commercial tariff
    Maximum demand charge per month RM/kW 30.30 14.00
    For all kWh sen/KWh 36.50  
    Tariff C2 – Medium voltage peak/off-peak commercial tariff
    For each kilowatt of maximum demand per month during the peak period RM/kW 45.10 14.00
    For all kWh during the peak period sen/KWh 36.50  
    For all kWh during the off-peak period sen/KWh 22.40  
    Tariff E1 – Medium voltage general industrial tariff
    Maximum demand charge per month RM/kW 29.60 14.00
    For all kWh sen/KWh 33.70  
    Tariff E2 – Medium voltage peak/off-peak industrial tariff
    For each kilowatt of maximum demand per month during the peak period RM/kW 37.00 14.00
    For all kWh during the peak period sen/KWh 35.50  
    For all kWh during the off-peak period sen/KWh 21.90  
    Tariff E3 – High voltage peak/off-peak industrial tariff
    For each kilowatt of maximum demand per month during the peak period RM/kW 35.50 8.00*
    For all kWh during the peak period sen/KWh 33.70  
    For all kWh during the off-peak period sen/KWh 20.20  
    Tariff F1 – Medium voltage general mining tariff
    Maximum demand charge per month RM/kW 21.10 14.00
    For all kWh sen/KWh 31.30  
    Tariff F2 – Medium voltage peak/off-peak mining tariff
    For each kilowatt of maximum demand per month during the peak period RM/kW 29.80 14.00
    For all kWh during the peak period sen/KWh 31.30  
    For all kWh during the off-peak period sen/KWh 17.20  
    Tariff H1 – Medium voltage general specific agriculture tariff
    Maximum demand charge per month RM/kW 30.30 14.00
    For all kWh sen/KWh 35.10  
    Tariff H2 – Medium voltage peak/off-peak specific agriculture tariff
    For each kilowatt of maximum demand per month during the peak period RM/kW 40.80 14.00
    For all kWh during the peak period sen/KWh 36.50  
    For all kWh during the off-peak period sen/KWh 22.40  

    Notes:

    1.This new Standby rate (as of 1 January 2014) is applicable to:

    a.All new co-generation costumers

    b.Existing co-generation customers who wish to migrate to this new Standby rate

    2.If you are an existing co-generation customer who wishes to maintain the previous Standby (Firm & Non-Firm) rates, the previous Standby (Firm & Non-Firm) rates together with the new Top-Up rate (as of 1 January 2014) will be applicable to you.

    3.1.6% as Feed-in-Tariff (FiT) for RE Fund will be imposed on your monthly bill (excluding domestic consumers with monthly consumption of 300kWh and below) effective 1 January 2014.

    4. * Standby charges for high voltage CoGen customers effective 1st January 2020.

myTNB
  • Residential
  • Business
  • Energy Efficiency
  • Renewable Energy
  • Payment
  • Safety and Advisory
  • Promotions
For General Enquiries, Please Contact TNB CareLine via Facebook  @TNBCareline or Call 1-300-88-5454
  • Weekdays: 8.00 AM - 7.00 PM
  • Weekend & Public holiday: 8.00 AM - 5.00 PM
  • Email us at   tnbcareline@tnb.com.my
    Follow Us On
    Download myTNB App
    Browser Compatibility
    myTNB
    myTNB
    • Terms & Conditions
    • Privacy Policy
    • Guides & Booklets

    Copyright © 2025 Tenaga Nasional Berhad. All Rights Reserved.

    Browser Compatibility Requirement
    Supported browsers would be limited to the following (compliant with HTML5 and above and CSS3 standards) with best view resolution of 1920 x 1080:
    Internet Explorer
    Internet Explorer
    (10.x and above)
    Mozilla Firefox
    Mozilla Firefox
    (38.x and above)
    Google Chrome
    Google Chrome
    (42.x and above)
    Safari
    Safari
    (8.x and above)